Get ASME B30-3-CONSTRUCTION OF TOWER CRANES PDF

By ASME

B30.3 applies to "construction tower cranes" and "permanently fastened tower cranes" which are powered by way of electrical vehicles or inner combustion engines and that fluctuate their working radius via a luffing increase mechanism, a trolley traversing a horizontal jib, or a mixture of the 2.

Show description

Read or Download ASME B30-3-CONSTRUCTION OF TOWER CRANES PDF

Best construction books

Gypsum Construction Handbook, Centennial Edition 2000 by United States Gypsum USG Corporation PDF

This 5th version of the Gypsum building instruction manual is a consultant to development techniques for gypsum drywall, cement board, veneer plaster and traditional plaster building in influence in 2000.

Electrician's Pocket Manual (Pocket References - download pdf or read online

Entire, compact and that includes formulation, tables, and diagrams as opposed to long textual content descriptions, this useful reference grants job-essential details in a short look-up structure. the recent moment version has been up-to-date to incorporate the 2005 nationwide electric Code, new symbols for electric drafting now getting used in CAD drafting, extra insurance of co-axial cable in domestic wiring, and extra on electrical cars and controls.

VOB/B 2012 - Textausgabe/Text Edition: Vergabe- und by Springer Fachmedien Wiesbaden PDF

Das Interesse ausländischer Bauherren und Investoren an den Inhalten der Vergabe- und Vertragsordnung für Bauleistungen, Teil B: Allgemeine Vertragsbedingungen für die Ausführung von Bauleistungen (VOB/B) ist groß. In den meisten Ländern gibt es keine vergleichbare Verordnung, um Aufträge zu vergeben, solide Bauverträge abzuschließen und verlässliche bauvertragliche Abmachungen zu vereinbaren.

Additional info for ASME B30-3-CONSTRUCTION OF TOWER CRANES

Sample text

Telescoping: a process whereby the height of a traveling or fixed base crane is increased without removal of the superstructure. This may be accomplished by raising the superstructure (by means of a special telescoping section) and adding tower (mast) sections at the top, by raising an inner tower and the superstructure (by means of special jacking equipment) and then adding sections at the top of an outer tower, or by raising the superstructure and tower (by means of a special base section) and adding sections to the tower from below.

H) Provisions shall be made to prevent simultaneous activation of controls when more than one operator’s station (remote control) is provided (i) Where cranes are powered by hydraulic motors, means shall be provided tÖ automatically stop the power plant on loss of hydraulic pressure. 3 Swaged, compressed, or wedge socket fittings shall be applied as recommended by the rope, crane, or fitting manufacturer. 4 Wire rope clips used in conjunction with wedge sockets shall be ‘0 *e unloaded dead end of the rope only (see Fig.

No part of this document may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission of the publisher. A. COPYRIGHT 2002; American Society of Mechanical Engineers Document provided by IHS Licensee=Qatar Petroleum/5943408103, User=, 10/14/2002 08:50:46 MDT Questions or comments about this message: please call the Document Policy Management Group at 1-800-451-1584. 3b1998 was approved by the American National Standards Institute on October 14, 1998.

Download PDF sample

ASME B30-3-CONSTRUCTION OF TOWER CRANES by ASME


by Steven
4.1

Rated 4.66 of 5 – based on 42 votes